Home / IS-Bauen / Projects / Scaffolds / Working scaffold |
In a nuclear power plant a scaffold to perform works at a castor container was needed. The scaffold had to be able to be splitted into two parts to insert the container. One part must be mobile to close the scaffold by hand. The other part of the scaffold must include a portal to be able to run in a trolley (see sections A-A and B-B near the truss-bar).
We designed and drew the carrying system and the coating and described the necessary boundary conditions for the usage.