Home / IS-Bauen / Projects / Timber / Carpenters workshop |
Timber panel wall |
DescriptionThe existing glued laminated girders are replaced due to the extension of the workshop. At the lower chord of the timber trusses an intermediate ceiling for small live loads was integrated and calculated. The stabilization is done with bracings at the coupled purlins and timber panel walls at three sides. The long side of the extenion is not closed. So also the loads from lifting wind had to be considered. Intermediate ceiling at the trusses |